Assume the representative project has four pieces of major
equipment.
On the representative project, a
spends at least
on creating and maintaining the equipment and line list due to multiple options
and "what-if" scenarios. These hours are required to synchronize results of equipment
design and line size calculations between various paper and computer tools.
In addition, a
spends at least
creating and maintaining the associated plot plan and flow diagrams.
ConcepSys
by automatically generating and mainting process flow diagram, equipment list, and
line list as the process engineer develops the project. At an average cost of $100
per hour, ConcepSys
.